1976
-The first stone in the foundation of Akfen Holding was laid with the establishment of AKINISI A.Ş. by Hamdi Akın for producing heat equipment and pressured vessels.

1977
-Akfen Mühendislik Müşavirlik Müteahhitlik ve Mümessillik A.Ş. (Akfen Engineering Consultancy Contracting and Distributorship Inc.) was founded.

1981
- Ankara Haymana Police Houses’ construction was completed.
- The construction of Ankara O.G. Kesici Factory for Pounding Parts and Molding was completed.

1984
- Akfen Engineering Consultancy Contractorship and Distributorship Inc. started its operations at Rüzgarlı Sokak, Ankara
- Ankara Horizontal National Electro Motor-pumps Provision and Assembly project was completed
- Kastamonu City Center Pressured Air Compressors Production and Assembly project was completed.
- Ankara T-24 Water Reservoir, Service Building and SE-4 Zone construction was completed.

1984
- Ankara O.G. Kesici Factory Central Heating Plumbing Compressed Air Premises was constructed.

1986
- Akfen won its first public tender in a move that reinforced its position in the industry. Akfen İnşaat Turizm ve Ticaret A.Ş. (Akfen Construction Tourism and Trade Inc.) was founded.

1987
- Ankara Ayvalı River Waste Water and Rain Water Drainage System’s construction was completed.

1987
- The construction of the Collecting Drain Between Ankara Batıkent Gendarme Entry and Ankara Creek was completed.

1987
- Ankara Çayırhan Thermal Power Plant Low Pressure Pipes, Pump and Tanks project was completed.

1987
- Ankara Etlik Barracks Solid Fuel Heating Plant Reinforcement Construction project was completed.

1987
- Izmir Aliağa Mineral Oil Batching Plant - Tin Filling Pipeline Construction was completed.

1988
- Construction of Ziraat Bank’s Davutlar Training and Social Rest Establishment at Kuşadası, Aydın, was completed.

1988
- Construction of Ziraat Bank’s Davutlar Training and Social Rest Establishment at Kuşadası, Aydın, was completed.
- Construction of Additional Hotel and Heating Center at Ilıca, Kütahya, was completed
- Construction of the Heat Station and Drainage System of the Social Settlement Site at Orhaneli, Bursa, was completed.

1988
- Construction for the Expansion of the Central Heating System at Orhaneli, Bursa, was completed.

1988
- Construction of the Mineral Oil Batching Plant at Aliağa, Izmir, was completed.

1989
- Construction of Antalya Airport Apron Enlargement and Miscellaneous Works was completed.
- Construction of the Escalator at the Terminal Building of Antalya Airport was completed.
- Construction of the Soldiers Pavilion at 4th Company, 2nd Army Signal Battalion of Kahramanmaraş was completed
- Construction of the Water Treatment Facility for Human Consumption at Behiçbey, Ankara was completed.
- Construction of a Building and Installation of the Central Heating System at Ankara Armored Forces School was completed.
- Construction for the Enlargement of the Heating Center at Ankara Armored Forces School and Training Division Command was completed.
- Missing Works at Circulation Gas Compressor at Aliağa, Izmir was completed.
- Maintenance of the Pier at Toloz, Uzunada, İzmir, was completed.
- Construction of the Heating Center and Fortification Works at Ankara Armored Forces School and Training Division Command.
- Construction for the Completion of the Solid-Fueled Heating Center at Etlik Barracks, Ankara, was completed.
- Construction of the Chimney for the Solid-Fueled Heating Center at Etlik Barracks, Ankara, was completed.

1990
- Construction for the Renovation and Additional Beam at Antalya Airport Terminal Building was completed.
- Construction for the Restoration and Heating Center at Kuleli Military High School was completed.
- Boiler and annexes to the Central Heating Installation at Bursa Regional Directorate was completed.

1991
- Infrastructural Premises for the Expansion Area at Manisa Organized Industrial Zone was completed.
- Boiler Room at Ankara Firefighting Department was repaired.
- The Repair Work at the Boiler Room at the 17th Regional Directorate of Ankara was completed.

1992
- Construction of Bursa Intracity Natural Gas Distributing Pipeline was completed.

1992
- Infrastructure construction at Isparta Airport was completed.
- Natural Gas Pipeline Network for the Maintenance Workshop, Guesthouse and Hospital at Behiçbey, Ankara, was completed.
- Conversion to Natural Gas and Chemical Cleaning was conducted at the Heating Center of Ankara Railway Station.
- Construction and Assembly of the Power Transmission Line at Manisa Organized Industrial Zone was completed.
- Construction of the Mass Housing (30 Apartments) for the Gendarmery Officers-Non-Commissioned Officers in Manisa was completed.
- Construction of the Transformer Station and 12-Apartment Mass Housing Project at Manisa Organized Industrial Zone was completed.
- Operation Building and 1-Apartment Mass Housing Project in Çeşme, İzmir, was completed.
- Environmental Planning and Construction of Storage Building was completed at Manisa Paper Mill.

1993
- Construction of a Bazar and Houses in Oran, Ankara, was completed.

1993
- Construction of Basement, Social Premises and Pool Infrastructure for 139 Villas in Çeşme, İzmir, was completed.

1994
- Akınısı Factory, built by Akfen in Sincan, Ankara, started manufacturing activity.

1994
- Istanbul Halkalı 2. Infrastructure Construction for Etap B8 Region was completed.
- Construction of the Mail Distribution and Concentration Center at Bahçelievler, Istanbul, was completed.

1994
- Manisa Biological and Chemical Treatment Facility with 6500 m3/day capacity was completed.
- İzmir Aliağa Jet A1 8” Filling Pipeline Construction in Aliağa, İzmir was completed.
- Re-tubing Works for Japanese Boiler with 100 tons/h capacity in Aliağa, İzmir, was completed.

1995
- Construction of the Airport in Çarşamba, Samsun, was completed.
- Reinforced Concrete and Prefabricated Construction for Manisa Factory and Administrational Building was completed.
- Construction of the Charter Terminal for Istanbul Atatürk Airport was completed.

1996
- Construction of Highway Service Facilities at Üçköprü Location, Gerede, Gümüşova, Bolu, was completed.
- Construction of Natural Gas Distribution Pipeline at Ankara Organized Industrial Zone was completed.

1997
- Construction of Wuppertal Shopping Center in Germany was completed.
- Founding of TAV Airports with the partnership of Tepe-Akfen, and TAV’s winning the bidding for Istanbul Airport secured Akfen’s position as the leader of its industry.
- Construction of the Distant Carpark Addition to Terminal C at Istanbul Ataturk Airport was completed.
- Construction for the Enlargement of the Foundation Carpark at Istanbul Atatürk Airport was completed.
- IBS Sigorta ve Reasürans Brokerliği A.Ş. (IBS Insurance and Reinsurance Brokerage Inc.) and Akfen Turizm Yatırım ve İşletmeleri A.Ş. (Akfen Tourism Investment and Operations Inc.) were established.
- All companies operating under Akfen were all restructured under the holding.

1997
- Construction of İzmir Mavişehir 2nd Stage 3rd Group Houses (413 Apartments) was completed.
- Renewal of 5.8/10kV Cable between TEDAŞ (Turkish Electricity Distribution Inc.) and Refinery at Aliağa, İzmir, was completed.
- Construction of Regional Regulator at Gaziosmanpaşa, Istanbul, was completed.
- Construction of houses at Oran, Ankara, was completed.

1998
- Construction of the State Hospital at Suşehri, Sivas, was completed.

1999
- Construction of Post-Earthquake Mass Housing Project (580 Apartments) was completed.
- The System for Providing and Feeding Cooling Water for 70T Electric Arc Furnaces at Orhangazi, Bursa, was completed.
- The System for the Sale of Oil to the Fuel Oil Companies in Aliağa, İzmir, was completed.
- Construction for Drinking Water Units 7 and 8 in Ereğli, Zonguldak was completed.

1999
- Modernization Project for Moldova Chisinau Airport was completed.
- Founded in 1987 as a duty-free shop operator that works with TAV Airports, ATÜ became a part of TAV Holding, and BTA was founded for offering food & beverage services.
- Turkish Human Resources Education and Health Foundation (TİKAV) was founded.

1999
- Bafra, Samsun, Environmental Rehabilitation (Waste Water Treatment and Drainage) Project was completed.
- Construction of Şırnak Primary Schools was completed.
- Construction of Şırnak Primary Schools was finished.

2000
- New International Flights Terminal Building at Istanbul Ataturk Airport was completed.
- Renewal of 72” Salty Water Pipeline No.2 at Ereğli, Zonguldak, was completed.
- Provision and Assembly of Mechanical and Electrical Equipment for TM6, TM17 and TM18 Pump Stations at Çeşme, İzmir, was completed.
- Reconstruction of the Parallel Taxiway at Kayseri Erkilet Airport was completed.

2003
- Campus construction at Ankara TED College was completed.
- TAV Construction was founded, and the construction knowhow gained during the construction of the airport terminals was collected under this company.
- Sanovel Pharmaceuticals Factory was founded in Silivri, Istanbul.
- Construction of Sedifloc Addition to the Water Pre-Treatment Project in Aliağa, İzmir, was completed.

2003
- 200-Bed Fethiye State Hospital was completed in Muğla.
- 2nd Stage of Infrastructural Reinforcement Construction at Muğla University’s Campus was completed.
- Restructuring of Düzce Business Centers was completed.

2004
- Construction of the Library, Data Processing Center and Auditorium Buildings at Muğla University was completed.
- BTA Istanbul International Airport Hotel was opened.
- TAV assumed the construction and operation of the Domestic and International Flights Terminal at Esenboğa Airport.
- TAV Esenboğa Yatırım ve İşletme A.Ş. (TAV Esenboğa Investment, Construction and Operation Inc.) was founded.
- TAV İşletme Hizmetleri A.Ş. (TAV Operation Services Inc.) was founded.
- Dubai and Egypt Branches of TAV Construction were founded.
- New Reformer and Diesel Desulphurization Unit Project at Tüpraş İzmit Refinery in Körfez, Kocaeli, was opened.

2005
- Akfen Holding and Singapore-based PSA Group wins the tender for the privatization of Mersin Port with a bid of 755 million dollars.
- Akfen Su (Akfen Water) and TÜVTURK Motor Vehicle Inspection Inc. were founded.
- Operation of Atatürk Airport Domestic Flights Terminal and General Aviation Terminal was also assumed by TAV.
- 60 percent of HAVAŞ’s shares were bought.
- Construction and operation of İzmir Adnan Menderes International Flights Terminal passed to TAV. TAV İzmir Terminal İşletmeciliği A.Ş. (TAV Izmir Terminal Operation Inc.) was founded.
- TAV Bilişim Hizmetleri A.Ş. (TAV Information Services Inc.) was founded, and all information services developed during the airport terminal construction and operation activity was collected under this company.

2005
- TAV won the tender for Tbilisi International Airport in Georgia.
- Airport operation company TAV Urban Georgia LLC was founded.
- TAV Havacılık A.Ş. (TAV Aviation Inc.) was founded.
- Sharjah Branch of TAV Construction was founded.
- TAV Airports won the lease tender for the operation for a period of 15.5 years of Atatürk Airport Domestic and International Flights Terminal Building, Multi-Storey Carpark and General Aviation Airport.
- TAV Istanbul Terminal İşletmeciliği A.Ş. (TAV Istanbul Terminal Operation Inc.) was founded.

2007
- 436-room Novotel & Ibis Hotel was opened in Zeytinburnu, Istanbul, and 108-room Ibis Hotel in Eskişehir, within the framework of the cooperation agreement with Accor Group of France, one of the world’s biggest hotel chains.
- TAV Airports Holding went public.
- New Passenger Terminal Building of Tbilisi International Airport was opened.
- Batumi International Airport was opened/ TAV Batumi Operations LLC was founded

2007
- TAV Airports won the tender for Monastir Habib Bourguiba and Enfidha Zine El Abidine Ben Ali International Airports in Tunis. TAV Tunisie SA was founded.
- 40% Minority stake was bought at Havaş. Havaş became a fully-owned TAV Airports subsidiary.
- TAV Airports acquired all shares of TAV İzmir and TAV Esenboğa.
- TAV Airports won the tender for the operation of Antalya Gazipaşa Airport.
- Hopa Terminal, operated by Havaş, was opened.

2007
- Levent Loft project, the first urban transformation project in loft-style in Turkey, was completed.
- Operating rights of Mersin Port were taken for a period of 36 years by signing a concession agreement for the transfer of the operating rights of Mersin port.
- 300-room Mercure Girne Hotel and Casino Girne were opened in the Turkish Republic of Northern Cyprus.
- Tunis, Bahrain and Libya branches of TAV İnşaat were founded.

2007
- TÜVTÜRK signed the license agreement for motor inspection stations in Turkey.
- Akfen Enerji Üretim ve Ticaret A.Ş (Akfen Energy Production and Trade Inc.) started its operations.
- Akfen Gayrimenkul Ticaret ve İnşaat A.Ş (Akfen Real Estate Trade and Construction Inc.) was founded.

2010
- 7.12% of Akfen Holding’s shares were offered to the public on 14 May 2010.

2011
- Tepe- Akfen-Souter-Sera Joint Venture Group gave the best bid at the privatization tender for İDO Istanbul Deniz Otobüsleri Sanayi ve Ticaret A.Ş. (İDO Istanbul Sea Buses Industry and Trade Inc.) by block sale.
- Electricity generation license for Laleli Dam-HEPP project was received.
- Antalya Gazipaşa Airport welcomes its first international passengers.
- Çamlıca 3 HEPP started commercial power generation in April.
- 177-Room Yaroslavl İbis Hotel, Russia, was opened on 8 September 2011.
- Karasu 4.2 HEPP started commercial power generation in November.
- Akfen Holding successfully completed 80 million lira bond issue in December.

2014
- Akfen Construction was the best bidder in Eskişehir City Hospital tender.
- Akfen Holding completed a stock buyback program and a bond issue with a nominal value of 400 million lira in April 2014. - A capital decrease was realized by way of cancelling the share certificates with a nominal value of 29.1 million lira in January 2015 for the purpose of starting a new buyback program.
- Mersin International Port (MIP) started an investment with a worth of USD 170 million in order to enhance the depth and capacity of the port.

2014
- Akfen Holding becomes a partner to a dormitory project to be built inside Hacettepe University.
- MIP was awarded for the fourth time “The Port of the Year” prize which is organized by Logitrans Lojistik.
- New Domestic Flights Terminal was opened at İzmir Adnan Menderes Airport.
- TGS, 50 percent owned by HAVAŞ which is a subsidiary of TAV Airports, won Turkish Airlines’ bidding for the ground services in 8 airports.

2014
- At İncek Loft project, 672 out of 1,199 flats were sold following the launch of the project in April.
- A contract was signed for the construction of residences, shopping center and carpark at Emaar Square project.
- Ibis Hotel Esenboğa, Ankara was inaugurated.
- Sekiyaka II HEPP 1, and Doruk and Doğançay HEPPs which have an installed capacity of 60.8 MW in total were inaugurated.

2014
- TAV İnşaat, Medine’de Suudi Havayolları Catering Binas ile Medine Havalimanı Otel Projesi inşaatlarına başladı.
- TAV Construction: Engineering News Records, published by the top 250 contracting companies of the world, selected TAV Construction as “The World’s Biggest Airport Construction Company” in 2014.
- TAV Airports became the operator of the newly constructed terminal of Croatia’s Zagrep Airport by 2042.
- TAV Airports took over the Domestic Flights Terminal of Milas-Bodrum Airport.

2015
- Akfen Holding completed its second stock buyback program which was started in February 2015, and decreased its capital by 14,819,314 lira by way of cancelling the repurchased stocks with the same nominal value in January 2016.
- In April 2015, Akfen Holding distributed a gross sum of 20 million lira in profit in cash.
- With Hamdi Akın and other shareholders acting along with him reaching the controlling stakeholder status in December 2015, the process for the use of the investors’ right of sale started for the period 23.12.2015 - 22.03.2016.
- MIP continued the construction works under its investment project for the purpose of expanding the depth and capacity of Mersin Port.
- MIP paid a total of TL 61 million lira in dividend in April 2015.
- Moody’s affirms MIP’s issuer and bond rating of Baa3 in June 2015 with stable outlook, while Fitch also confirmed the Company’s BBB- rating, outlook stable, in July 2015.
- TAV Airports distributed a total gross sum of 306 million lira in cash in profit in May 2015.
- ATÜ, a subsidiary of TAV Airports, received the operation rights of the duty-free shops at the George Bush Airport in Houston, Texas, in March 2015.
- The consortium established with ADP and Metro Pacific Investments Corporation received prequalification for the Public-Private Partnership tender including the operation, maintenance and repair rights for 5 local airports in Philippines in September 2015.
- In July 2015, the Holding decided to purchase shares in companies investing in solar and thermal power to expand the Holding’s energy portfolio. The process for the purchase of 100% of the shares of Karine Enerji which held 29.75% of the shares of Akfen Termik, and also investments in solar energy. An additional 40% share was purchased in Adana İpekyolu in October 2015.
- Sekiyaka II HEPP 2 project having an installed power capacity of 1.09 MW was taken into operation in September 2015.
- Engineering News Records, published by the top 250 contracting companies of the world, selected TAV Construction as “The World’s Biggest Airport Construction Company” in 2015, for the second year in a row.
-Refinancing of all existing loans of Akfen GYO and its subsidiaries was completed in November 2015.
-With the start of the Environmental Impact Assessment (EIA) process regarding Ambarlı Ro-Ro port project at IDO, Istanbul Sea Buses Company, in July 2015, the Holding assumed relevant works to this end. Ro-Ro transportation was started in November 2015 to provide services for the lories and trucks at Ambarlı-Topçular line.

2015
- A deed of partnership was signed with European Bank for Reconstruction and Development (EBRD) in December 2015 for payment of USD 100 million against 20 percent share in a new company (Akfen Renewable Energy) to be established by the merger of Akfenhes, Akfenres, Akfen Toptan and Karine GES - following its transfer to the Holding.

2015
- Ibis Hotel Moscow was inaugurated in Russia in July 2015.

2016
- The construction of Isparta Student Hostel having a capacity of 3,000 students was started.
- Akfen Holding completed its second stock buyback program which was started in February 2015, and decreased its capital by 14,819,314 lira by way of cancelling the repurchased stocks with the same nominal value in January 2016.
- Akfen Holding distributed a total gross sum of 20 million lira in cash bonus in April 2015.
- With Hamdi Akın and other shareholders acting along with him reaching the controlling stakeholder status in December 2015, the process for the use of the investors’ right of sale started for the period 23.12.2015 - 22.03.2016.

2016
- The construction of Kütahya Student Hostel having a capacity of 3,000 students was started.
- MIP continued the construction works under its investment project for the purpose of expanding the depth and capacity of Mersin Port.
- MIP paid a total of TL 61 million lira in dividend in April 2015.
- Moody’s affirms MIP’s issuer and bond rating of Baa3 in June 2015 with stable outlook, while Fitch also confirmed the Company’s BBB- rating, outlook stable, in July 2015.
- TAV Airports distributed a total gross sum of 306 million lira in cash in profit in May 2015.
- ATÜ, a subsidiary of TAV Airports, received the operation rights of the duty-free shops at the George Bush Airport in Houston, Texas, in March 2015.

2016
- The ground was broken for the construction of Bodrum Loft project to be built by Akfen Construction.
- The consortium established with ADP and Metro Pacific Investments Corporation received prequalification for the Public-Private Partnership tender including the operation, maintenance and repair rights for 5 local airports in Philippines in September 2015.
- In July 2015, the Holding decided to purchase shares in companies investing in solar and thermal power to expand the Holding’s energy portfolio. The process for the purchase of 100% of the shares of Karine Enerji which held 29.75% of the shares of Akfen Termik, and also investments in solar energy. An additional 40% share was purchased in Adana İpekyolu in October 2015.
- Sekiyaka II HEPP 2 project having an installed power capacity of 1.09 MW was taken into operation in September 2015.

2016
- Akfen İnşaat started the construction of Bulvar Loft project at İncek, Ankara.
- Engineering News Records, published by the top 250 contracting companies of the world, selected TAV Construction as “The World’s Biggest Airport Construction Company” in 2015, for the second year in a row.
- Refinancing of all existing loans of Akfen GYO and its subsidiaries was completed in November 2015.
- With the start of the Environmental Impact Assessment (EIA) process regarding Ambarlı Ro-Ro port project at IDO, Istanbul Sea Buses Company, in July 2015, the Holding assumed relevant works to this end. Ro-Ro transportation was started in November 2015 to provide services for the lories and trucks at Ambarlı-Topçular line.

2016
- A deed of partnership was signed with European Bank for Reconstruction and Development (EBRD) in December 2015 for payment of 100 million dollars against 20 percent share in a new company (Akfen Renewable Energy) to be established by the merger of Akfenhes, Akfenres, Akfen Toptan and Karine GES - following its transfer to the Holding.

2017
- Isparta City Hospital was inaugurated at a ceremony joined by Prime Minister Binali Yıldırım, Health Minister Recep Akdağ, Akfen Holding Chairman Hamdi Akın, and a high number of other visitors. (24 March 2017)
- Akfen Holding was given TR AAA rating by TURKrating (Istanbul International Rating Services Inc.) which is the highest rating given to a company involved in real economy. (3 January 2017)
- Akfen Holding successfully completed its bond issue worth 150 million lira, which it had to raise to 300 million lira due to strong demand, with 3 year maturity and interest payable every three months. (8 January 2017)
- Loft Trade, second-hand official sale and rental office for İncek Loft, which was constructed by Akfen İnşaat as the biggest housing project of İncek, Ankara, was opened. (16 February 2017)
- Bulvar Loft, Akfen Construction’s housing project in Ankara became the sponsor for the Selection of “One Country: Spain” at Ankara International Film Festival. (22 April 2017)
- Akfen Holding’s Deputy General Manager Hüseyin Kadri Samsunlu was included to the list of ”The Most Efficient 50 CFO” of Turkey which was prepared by Fortune Turkey and DataExpert based on the top one thousand companies in Turkey. (3 May 2017)
- Turkey’s construction giant Akfen Construction hosted the famous Turkish youtuber Enes Batur Sungurtekin at the “İncek Loft”, Akfen’s housing project in Ankara. (15 May 2017)
- Akfen Holding sold its remaining 8.1 percent share in TAV Airports Holding, to its French partner Group ADP against 160 million dollars. (9 June 2017)
- Competition Board gave approval for the transfer of the shares of TAV Airports Holding owned by Akfen Holding, to Aereports de Paris SA via its subsidiary named Tank ÖWA Alpha GmbH. (15 July 2017)
- Model flats of ‘Bulvar Loft’ project constructed by Akfen İnşaat at İncek, Ankara, were opened to visitors. (20 July 2017)
- Akfen Holding signed a share transfer contract with Australian infrastructural fund IFM Investors for the transfer of its 40 percent share in 50 percent of Mersin International Port against 869 million dollars. (28 July 2017)
- IBS Sigorta ve Reasürans Brokerliği (IBD Insurance and Reinsurance Brokerage) became the front and back jersey sponsor of Göztepe, a newcomer to the Turkish Super League. (15 August 2017)
- Akfen Holding was found worthy of Golden Award in Business Transformation category of 2017 SAP Quality Awards. (23 October 2017)
- İncek Loft Art Gallery by RC, the first art gallery in a housing project in Ankara was opened at İncek Loft project, built by Akfen Construction. (27 October 2017)
- Akfen Holding A.Ş.’s Long Term National Credit Rating was affirmed as TR AAA, Short Term National Credit Rating as TR A1, and its outlook as stable. (13 December 2017)
- Akfen Holding A.Ş.'nin Uzun Vadeli Ulusal Kredi Derecelendirme Notu TR AAA, Kısa Vadeli Ulusal Kredi Derecelendirme Notu TR A1 ve görünümü durağan olarak teyit edilmiştir. (13 Aralık 2017)
- IBS Sigorta ve Reasürans Brokerliği A.Ş. (IBS Insurance and Reinsurance Brokerage Inc.) marked its 20th anniversary at a ceremony in Raffles Hotel. (22 December 2017)

2017
- Solentegre GES and Solentegre Enerji Yatırımları Ticaret A.Ş. (Akfen Holding) were found worthy of prize at the Renewable Energy Power Plants “Solar” category under “ICCI Energy Awards” which is aimed at selecting the best among the leading power producer companies in Turkey. (3 May 2017)

2017
- At the EMEA Finance Project Finance Awards, organized by EMEA Finance, which is one of the leading finance publications of Europe, Middle East and Africa (EMEA), Eskişehir City Hospital, being built by Akfen Construction, was given the Best Health Project Award with its 18-year maturity, 344 million euro project financing. (22 May 2017)

2017
- Giresun Çalıkobası Hydroelectric Power Plant (HEPP) built by Akfen Yenilenebilir Enerji A.Ş. (Akfen Renewable Energy Inc.) which will provide power for 9,000 houses started production. Çalıkobası HEPP project which has 18 megawatt capacity was completed with an investment of 35 million dollars. (5 June 2017)

2017
- The number of graduates from the Individual Development Program organized by Turkish Human Resources Education and Health Foundation (TİKAV), which was established by Akfen Holding in 1999, for the purpose of creating equality in opportunity for all university students, reached 300. (17 June 2017)

2017
- Mersin International Port hosted the first mega ship following the 650 million lira investment in 2016. 368-meter long YM World container ship arrived at the East Med Hub Terminal. (1 July2017)

2017
- Bodrum Loft project, designed by Tabalıoğlu Architecture Office for Akfen Construction, was found worthy of the grand prize at the “Tourism Investments Project” category in the World Architecture Festival 2017. (21 November 2017)

2017
- Akfen Holding marked its 41th Foundation Anniversary with the “Akfen Years” concert held at Zorlu Performing Arts Center. Sertab Erener, Levent Yüksel and Aşkın Nur Yengi sang together at the concert where the orchestra was conducted by Fahir Atakoğlu. (6 December 2017)

2018
- In February 2018, the merger of Akfen Holding and Akfen Mühendislik A.Ş. was completed.
- In March 2018, 37% IBS Insurance share of Akfen Infrastructure Holding was transferred to Akfen Holding.
- In March 2018, Akfen International was established as a 100% subsidiary of Akfen Holding in Amsterdam / Netherlands.
- In May 2018, 100% share of Selim Akın in Masanda Turizm was transferred to Akfen Infrastructure Holding.
- In May 2018, The process of changing the title of Akfen Infrastructure Consultancy to "Akfen Infrastructure Holding Inc." was completed.
- After the share transfer transactions made within Akfen Holding in August 2018, Akfen Infrastructure Holding has acquired 99.36% of Akfen Holding capital.
- In November 2018, Akfen Holding completed the merger by acquiring Akfen Thermal Energy and Akfen Energy Distribution.

2018
- OmicronEngil 208 SPP (12.1 MW) started operations on 20 September, Omicron Erciş SPP (12.1 MW) started operations on 21September. Yaysun SPP (12.1 MW), MT Natural SPP (12.1 MW) and Me-Se SPP (12.1 MW) started generation on 27 September.

2018
- In October 2018, Eskişehir City Hospital was opened.

2019
- As of 15 March 2019, Acacia Maden produced its first saleable copper.
- On 20 November 2019, Akfen Holding issued bonds worth 200 million TL with a maturity of 2 years to qualified investors.
- As of 9 December 2019, Akfen Renewable Energy has increased its capital. After the increase, the shares of EBRD and IFC increased to 16.933% and Akfen Holding's share was 66.134%.
- In 2019, 4 WPPs with a total installed capacity of 268.6 MW, 1 GES with an installed capacity of 13 MW and 1 HEPP with an installed capacity of 7 MW became operational.

2019
- In December 2019, the share purchase agreement for 2 WPP purchases with an installed capacity of 80 MW of Zorlu Wind Energy was signed, the purchase transaction was completed in February 2020.
- MIP exported $ 600 million in Eurobonds in November 2019. The 5-year bond was issued at 5.375% coupon interest rate.
- Akfen Environment and Water sold all of its shares in Akfensu-Arbiogaz Dilovası (75% share) to Kocaeli Gebze Dilovası Organized Industrial Zone (DOSB) on August 1, 2019.

2019
- The “Hygiene is Health” project under the coordination of TİKAV and Akfen Renewable Energy financing, were provided with hygiene training 2,000 women in 26 different rural areas. With the collaboration of TİKAV and Akfen Renewable Energy since 2017, approximately 4,300 women living in rural areas were reached to seminars with the 3 social responsibility projects titled “We Have Been Schooled At Home”, “Health First” and “Hygiene is Health”.

2019
- Akfen Renewable Energy provided 'Turkey's largest green energy loan' with combine power of 6 local and foreign banks to build 13 WPP’s and SPP’s in Turkey with local renewable energy, in $ 530 million. With this loan, Akfen Renewable Energy is rewarded 2019 Turkey Bonds & Loans Awards" as "ECE / Export Finance Deal of the Year" and second prize in “Natural Resources Finance Deal of the Year” category.

2020
- İbrahim Süha Güçsav, who was the CEO of Akfen Holding, left due to his retirement, Akfen Holding Deputy Chairman of the Board of Directors Selim Akın was appointed as the new CEO of Akfen Holding.
- Bodrum Loft opened its doors with the 2020 summer season.

2020
- Tekirdağ İsmail Fethi Cumalıoğlu City Hospital was inaugurated at a ceremony joined by President Recep Tayyip Erdoğan. The Hospital is constructed bu Akfen İnşaat with Public-Private Partnership (PPP) model.
- Akfen Renewable Energy reached 706.0MW installed power.